Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13654605

- Product Categories
- Friendly Links
Information Name: | Epoxy sales Nantong, Jiangsu Nantong construction epoxy floor paint |
Published: | 2015-02-04 |
Validity: | 30 |
Specifications: | |
Quantity: | 999999999.00 |
Price Description: | |
Detailed Product Description: | Vinyl esters coating: a vinyl ester resin with a roller to a uniform coating. Construction Points: ◆ pre-construction needs to maintain a clean, if you need to clear the debris adhered to in accordance with the correct proportion ◆ main agent and hardener mix, stir with a roller ◆ ◆ uniform coating material mixed materials needed to complete the construction within 30 minutes to complete the construction ◆ the proper interface junction coating treatment regimen hardening time of about eight hours spread over 3 fiberglass cloth: a continuous lining paste method. First in the surface layer of adjacent parts of brushing with a good anti-corrosion coating solution, brushing anticorrosive coating solution should be uniform, carefully, quickly, brush one aspect each time, can leak brush. Then paste lining glass cloth, glass cloth must be soaked in antiseptic coating solution. Generally lap not less than 50mm, the layers should be staggered joints take each other, not overlap. Evenly coated. The vinyl ester coating: a vinyl ester resin with a roller is uniformly applied three. Construction Points: ◆ pre-construction needs to maintain a clean, if you need to clear the debris adhered to in accordance with the correct proportion ◆ main agent and hardener mix, stir with a roller ◆ ◆ uniform coating material mixed materials to be completed within 30 minutes of completion of construction ◆ ◆ Construction junction proper interface handle the coating curing time of about eight hours or more health 5. vinyl ester rolling surfaces: vinyl ester roll ground two. So that the ground light, protect, anti-corrosion, acid effect. Construction Points: ◆ the need to maintain the pre-construction clean, if you need to clear the debris adhered to the front of the paint before use ◆ ◆ Stir in accordance with the correct proportion of the paint and paint hardener mix, stir ◆ Use the material evenly coated roller ◆ mixing materials to be completed within 30 minutes of completion of construction should be done after the junction ◆ Construction ◆ Construction handover processing is completed, 24 hours before the Master, before the weight and washed with water (25 ℃ to prevail after 72 hours, opening at low temperatures time required to appropriately extended) |
Admin>>>
You are the 8283 visitor
Copyright © GuangDong ICP No. 10089450, Building Materials Co., Ltd. Suzhou Burgundy (Chuzhou Branch) All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 8283 visitor
Copyright © GuangDong ICP No. 10089450, Building Materials Co., Ltd. Suzhou Burgundy (Chuzhou Branch) All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility